Maritime, Port and Coastal Engineering
Dry Storage in Mataró and Premià de Mar
Study of location and Dry Storage research at the ports of Mataró and Premià de Mar. Mataró and Premià de Mar (Barcelona), April 2008 ...
read moreBuoy Mooring Area in Cala Guillola
Project for the installation of an ecological Buoy Mooring Area in Cala Guillola. Cala Guillola (Cadaqués, Girona), September 2014 ...
read moreRepair project of the Evaristo Fernández dock
Repair project of the Evarisro Fernández dock in the port of Barcelona. Barcelona, june 2013. ...
read moreStudy of port pumping in Banyuls-sur-Mer
Study of port pumping in the port of Banyuls-sur-Mer. Banyuls-sur-France (France), december 2013. ...
read moreDocks in Santa Margarida, Roses
Repair project and new distribution studies of fleet docks in Santa Margarida. Santa Margarida, Roses (Girona). ...
read moreDredging project in Santa Margarida
Dredging project in the entrance of Santa Margarida. Santa Margarida, Roses (Girona), August 2013. ...
read moreOvertopping studies in the port of Calafat
Overtopping studies with project solutions in the port of Calafat. Calafat, l’Ametlla de Mar municipal district (Tarragona), 2006. Budget: 4,23 M€ ...
read moreOvertopping analysis in Port Calafat
Overtopping analysis with project design solutions in Port Calafat Port Calafat (Tarragona), 2006 4,23 M€
read moreFleet design in Roses and in l’Escala
New configuration and fleet design in Santa Mararida (Roses) and in l’Escala. Santa Margarida (Roses, Girona), l’Escala (Girona),...
read moreMarina in the port of l’Estartit
Project Management and Project Construction of the Marina Agrupació Nàutica Llevantina (port of l’Estartit) L’Estartit (Girona), 2005-2010 2,5...
read more